EVgo Charging Station Installation: A Simple 3-Step Process for Businesses
Electric vehicle (EV) fast charging stations are perfect for locations where people spend 15-45 minutes, such as grocery stores, shopping malls, and downtown areas. EVgo makes the installation process simple and cost-free for site hosts, managing everything from design to maintenance.
Benefits of EVgo Partnership:
- Zero cost to property owners
- Complete management of installation and maintenance
- Handles all electrical upgrades and utility contracts
- Attracts new customers
- Future-proofs property
- Supports sustainability goals

EVgo Fast Charging Partner Logo
Installation Process in 3 Steps:
- Site Confirmation and Contract (2-4 weeks)
- EVgo evaluates site viability
- Determines charger locations
- Prepares proposal
- Executes contract
Required from site host:
- Property owner information
- Third-party consent requirements
- Current utility bill
- Site plans
- Utility easement terms
- Authority Having Jurisdiction details
- Design and Construction (3-6 months)
- Engineering and permitting
- Utility design
- Construction planning
- Power installation

EV charging station construction timeline
Site host responsibilities:
- Review easement plan with teams
- Schedule pre-construction meeting
- Coordinate power shutdown
- Commissioning (2 weeks)
- Final installation steps
- Utility power connection
- Charger activation
- Network integration
- Driver notification

Hand holding phone with EVgo app
With over 800+ fast charging installations across 34 states, EVgo has streamlined the process to make it efficient and hassle-free. Site hosts can expect operational chargers within a few months, bringing new visitors to their property while supporting sustainable transportation.
Related Articles

Stable Auto and EV Connect Partner to Launch AI-Powered Adaptive Pricing for EV Charging Networks